Projects References

Wastewater Treatment Plant and Upgrade

Client: Nestle South Africa
Project Description:

Turnkey design and installation of a Wastewater treatment plant, comprising of a collection sump upgrade dissolved air flotation (DAF) unit.

Yeast Autolysis Plant

Client: SABMiller, Maluti Mountain Brewery
Project Description:

Turnkey design and installation of a yeast autolysis plant integrated with existing process and utilities.

Wastewater Treatment Plant for Coca-Cola Bottling

Client: Coca-Cola Bottling Luanda S.A.R.L.
Project Description:

Design and turnkey supply and installation of wastewater treatment plant comprising of a high-rate bio-filter, SBR aerobic treatment, and sludge dewatering.

Tannery Wastewater Treatment Plant Design and Installation

Client: Exotan Camexo
Project Description:

Tannery wastewater plant design and installation, inclusive of sulphide oxidation, chrome removal, and activated sludge aerobic treatment.

Water Treatment Plant

Client: Hulamin Limited
Project Description:

Plant 1 – pH Correction, clarification through floc settling, and dewatering by decanter centrifuge, and oil separation Plant 2 – Effluent Heating, oil separation, pH correction, and Dissolved air flotation.

Design and Installation of Ultrafiltration Treatment Plant

Client: Assmang Pty Ltd, Cato Ridge Works
Project Description:

Engineering design and turnkey installation of ultrafiltration water treatment plant for harvesting of storm water for recycling back to process use.

Wastewater Treatment Plant Supply and Installation

Client: SABMiler, Tanzania Breweries Limited
Project Description:

Design and turnkey supply and installation of wastewater treatment plant, inclusive of 8 000 kg COD/day anaerobic digestion, (Membrane Bio-Reactor) MBR aerobic treatment with water recovery through RO and ACF to process water quality, and biogas utilisation for steam generation.

Wastewater Treatment Plant

Client: Diageo, Meta Abo Breweries Limited
Project Description:

Design and turnkey supply and installation of wastewater treatment plant, inclusive of 14 300 kg COD/day anaerobic digestion, activated sludge (AS) aerobic treatment, and water treatment, inclusive of sand filtration, activated carbon filtration, softening, and reverse osmosis.

Waste to Energy Stream Installation

Client: SABMiller, Tanzania Breweries Limited
Project Description:

Design and turnkey supply and installation of waste to energy stream. Biogas demister, condensate removal, gas transfer, and vertical water tube boiler for steam generation.

Get In Contact With Us

Contact Enquiry
Address (Head Office):
20 Pentrich Road
Masons Mill
Pietermaritzburg
3201
Contact Details:
T: +27 (0) 33 346 1444
E: talbot@talbot.co.za



Laboratory Services